SPP request ERAS-2025-034
SPP queue ID ERAS-2025-034
Queue request ERAS-2025-034 was listed in the SPP interconnection queue at the end of 2025 as a 250 MW gas project in Jasper County, MO, according to Berkeley Lab’s queue data file. The filing names State Line 439 Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 1, 2030.
| Queue ID | ERAS-2025-034 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | State Line 439 Substation |
| Point of interconnection | State Line 439 161 kV Substation |
| County | Jasper |
| State | MO |
| Voltage | 161 kV |
| Capacity | 250 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2030-04-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Jasper, MO: 22 requests in the SPP queue, 9 active totaling 784 MW.
Tracked changes
Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | EMDE |
|---|---|
| Cluster | ERAS-2025-001; 03 CENTRAL |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | ERAS |
| Queue date | 2025-09-29 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.