SPP request ERAS-2025-034

SPP queue ID ERAS-2025-034

Queue request ERAS-2025-034 was listed in the SPP interconnection queue at the end of 2025 as a 250 MW gas project in Jasper County, MO, according to Berkeley Lab’s queue data file. The filing names State Line 439 Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 1, 2030.

Queue IDERAS-2025-034
Project nameNot reported
Status (as published)Active
SubstationState Line 439 Substation
Point of interconnectionState Line 439 161 kV Substation
CountyJasper
StateMO
Voltage161 kV
Capacity250 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2030-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Jasper, MO: 22 requests in the SPP queue, 9 active totaling 784 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityEMDE
ClusterERAS-2025-001; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)ERAS
Queue date2025-09-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.