Substation Scout

Harrison, TX interconnection queue

8 active projects totaling 3,387.5 MW in the SPP queue, plus 2 with terminal status (shown grayed).

8active projects
3,387.5active MW
10total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-377 Not reported 345 1,350 Gas Active
GEN-2006-012 Not reported n/r 610 Coal Withdrawn
GEN-2006-013 Not reported n/r 575 Coal Withdrawn
GEN-2022-GR1 Not reported 138 513 Gas Active
GEN-2024-343 Not reported 345 470.5 Gas Active
GEN-2022-139 Not reported 345 300 Battery Active
GEN-2023-059 Not reported 138 200 Hybrid Active
GEN-2024-178 Not reported 138 199 Battery Active
GEN-2022-038 Not reported 138 180 Solar Active
GEN-2023-193 Not reported 138 175 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.