Substation Scout

SPP request GEN-2022-GR1

SPP queue ID GEN-2022-GR1

Queue request GEN-2022-GR1 was listed in the SPP interconnection queue at the end of 2025 as a 513 MW gas project in Harrison County, TX, according to Berkeley Lab’s queue data file. The filing names Pirkey as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 15, 2027.

Queue IDGEN-2022-GR1
Project nameNot reported
Status (as published)Active
SubstationPirkey
Point of interconnectionPirkey 138 kV
CountyHarrison
StateTX
Voltage138 kV
Capacity513 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2027-12-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Harrison, TX: 10 requests in the SPP queue, 8 active totaling 3,387.5 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAEP
ClusterReplacement; 04 SOUTHEAST
Interconnection serviceERIS
Project typeReplacement
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2022-03-23

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first