Substation Scout

SPP request GEN-2023-193

SPP queue ID GEN-2023-193

Queue request GEN-2023-193 was listed in the SPP interconnection queue at the end of 2025 as a 175 MW hybrid project in Harrison County, TX, according to Berkeley Lab’s queue data file. The filing names Pirkey - Whitney Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 31, 2028.

Queue IDGEN-2023-193
Project nameNot reported
Status (as published)Active
SubstationPirkey - Whitney Line
Point of interconnectionPirkey - Whitney 138 kV Line
CountyHarrison
StateTX
Voltage138 kV
Capacity175 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-03-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Harrison, TX: 10 requests in the SPP queue, 8 active totaling 3,387.5 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAEP
ClusterDISIS-2023-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2023-10-02
Components (hybrid)Solar 175 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first