Douglas, NE interconnection queue
9 active projects totaling 981.1 MW in the SPP queue, plus 7 with terminal status (shown grayed).
9active projects
981.1active MW
16total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2024-140 | Not reported | 345 | 250 | Solar | Active |
| GEN-2024-372 | Not reported | 161 | 250 | Battery | Active |
| GEN-2024-179 | Not reported | 161 | 199 | Battery | Withdrawn |
| GEN-2024-188 | Not reported | 161 | 199 | Battery | Withdrawn |
| GEN-2018-037 | Not reported | 161 | 100 | Battery | Suspended |
| GEN-2021-039 | Not reported | 161 | 100 | Battery | Active |
| GEN-2025-SR20 | Not reported | n/r | 100 | Other | Active |
| GEN-2020-043 | Not reported | 161 | 56.5 | Gas | Operational |
| GEN-2020-044 | Not reported | 161 | 56.5 | Gas | Operational |
| GEN-2020-045 | Not reported | 161 | 56.5 | Gas | Operational |
| GEN-2020-046 | Not reported | 161 | 56.5 | Gas | Withdrawn |
| GEN-2020-047 | Not reported | 69 | 56.5 | Gas | Withdrawn |
| GEN-2020-048 | Not reported | 161 | 56.5 | Gas | Withdrawn |
| GEN-2020-049 | Not reported | 161 | 56.5 | Gas | Withdrawn |
| GEN-2020-050 | Not reported | 161 | 56.5 | Gas | Withdrawn |
| GEN-2017-198 | Not reported | 69 | 11.6 | Battery | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.