Substation Scout

SPP request GEN-2024-372

SPP queue ID GEN-2024-372

Queue request GEN-2024-372 was listed in the SPP interconnection queue at the end of 2025 as a 250 MW battery project in Douglas County, NE, according to Berkeley Lab’s queue data file. The filing names S1247 Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 1, 2028.

Queue IDGEN-2024-372
Project nameNot reported
Status (as published)Active
SubstationS1247 Substation
Point of interconnectionS1247 161 kV Substation
CountyDouglas
StateNE
Voltage161 kV
Capacity250 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2028-03-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Douglas, NE: 16 requests in the SPP queue, 9 active totaling 981.1 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOPPD
ClusterDISIS-2024-001; 02 NEBRASKA
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2025-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.