Substation Scout

SPP request GEN-2017-198

SPP queue ID GEN-2017-198

Queue request GEN-2017-198 was listed in the SPP interconnection queue at the end of 2025 as a 11.6 MW battery project in Douglas County, NE, according to Berkeley Lab’s queue data file. The filing names Jones St. No substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of February 28, 2027.

Queue IDGEN-2017-198
Project nameNot reported
Status (as published)Active
SubstationJones St. No substation
Point of interconnectionJones St. No 1201 69kV substation
CountyDouglas
StateNE
Voltage69 kV
Capacity11.6 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2027-02-28
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Douglas, NE: 16 requests in the SPP queue, 9 active totaling 981.1 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOPPD
ClusterDISIS-2017-002; 02 NEBRASKA
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2017-11-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.