Crosby, TX interconnection queue
3 active projects totaling 430 MW in the SPP queue, plus 5 with terminal status (shown grayed).
3active projects
430active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2016-120 | Not reported | 345 | 400 | Wind | Withdrawn |
| GEN-2017-151 | Not reported | 345 | 300 | Wind | Active |
| GEN-2010-034 | Not reported | 345 | 261 | Wind | Withdrawn |
| GEN-2013-017 | Not reported | 345 | 200 | Wind | Withdrawn |
| GEN-2016-175 | Not reported | 345 | 150 | Wind | Withdrawn |
| GEN-2011-025 | Not reported | 115 | 80 | Wind | Operational |
| GEN-2023-SR9 | Not reported | 115 | 50 | Battery | Active |
| GEN-2011-026 | Not reported | 69 | 19.7 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.