Substation Scout

Crosby, TX interconnection queue

3 active projects totaling 430 MW in the SPP queue, plus 5 with terminal status (shown grayed).

3active projects
430active MW
8total filed
Queue IDProjectkVMWResourceStatus
GEN-2016-120 Not reported 345 400 Wind Withdrawn
GEN-2017-151 Not reported 345 300 Wind Active
GEN-2010-034 Not reported 345 261 Wind Withdrawn
GEN-2013-017 Not reported 345 200 Wind Withdrawn
GEN-2016-175 Not reported 345 150 Wind Withdrawn
GEN-2011-025 Not reported 115 80 Wind Operational
GEN-2023-SR9 Not reported 115 50 Battery Active
GEN-2011-026 Not reported 69 19.7 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.