Substation Scout

SPP request GEN-2017-151

SPP queue ID GEN-2017-151

Queue request GEN-2017-151 was listed in the SPP interconnection queue at the end of 2025 as a 300 MW wind project in Crosby County, TX, according to Berkeley Lab’s queue data file. The filing names TUCO-Oklaunion as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 15, 2026.

Queue IDGEN-2017-151
Project nameNot reported
Status (as published)Active
SubstationTUCO-Oklaunion
Point of interconnectionTUCO-Oklaunion 345kV
CountyCrosby
StateTX
Voltage345 kV
Capacity300 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2026-10-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Crosby, TX: 8 requests in the SPP queue, 3 active totaling 430 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySPS
ClusterDISIS-2017-002; 05 SOUTHWEST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2017-11-28

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first