SPP request GEN-2011-025

SPP queue ID GEN-2011-025

Queue request GEN-2011-025 was listed in the SPP interconnection queue at the end of 2025 as a 80 MW wind project in Crosby County, TX, according to Berkeley Lab’s queue data file. The filing names Tap Floyd County - Crosby County as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 15, 2018.

Queue IDGEN-2011-025
Project nameNot reported
Status (as published)Operational
SubstationTap Floyd County - Crosby County
Point of interconnectionTap Floyd County - Crosby County 115kV
CountyCrosby
StateTX
Voltage115 kV
Capacity80 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2018-12-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Crosby, TX: 8 requests in the SPP queue, 3 active totaling 430 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySPS
ClusterDISIS-2011-001-8; 05 SOUTHWEST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2011-03-31
Operational date2018-12-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.