Substation Scout

SPP request GEN-2020-079

SPP queue ID GEN-2020-079

Queue request GEN-2020-079 was listed in the SPP interconnection queue at the end of 2025 as a 225 MW hybrid project in Cherokee County, KS, according to Berkeley Lab’s queue data file. The filing names Riverton-Neosho line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 15, 2028.

Queue IDGEN-2020-079
Project nameNot reported
Status (as published)Active
SubstationRiverton-Neosho line
Point of interconnectionRiverton-Neosho 161kV line
CountyCherokee
StateKS
Voltage161 kV
Capacity225 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-08-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cherokee, KS: 8 requests in the SPP queue, 4 active totaling 552.1 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityEDE
ClusterDISIS-2020-001; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2020-04-30
Components (hybrid)Solar 225 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first