Burt, NE interconnection queue

4 active projects totaling 1,125 MW in the SPP queue, plus 4 with terminal status (shown grayed).

4active projects
1,125active MW
8total filed
Queue IDProjectkVMWResourceStatus
GEN-2018-043 Not reported 345 500 Solar Active
GEN-2020-084 Not reported 345 350 Solar Active
GEN-2024-234 Not reported 161 200 Solar Active
GEN-2023-202 Not reported 161 150 Solar Withdrawn
GEN-2022-153 Not reported 161 100 Battery Withdrawn
GEN-2008-125O Not reported n/r 80 Wind Withdrawn
GEN-2017-105 Not reported 161 75 Wind Active
GEN-2019-071 Not reported 345 51 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.