8 active projects totaling 1,676.2 MW in the SPP queue, plus 12 with terminal status (shown grayed).

8active projects
1,676.2active MW
20total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-062 Not reported 765 488 Other Withdrawn
GEN-2009-069 Not reported 345 400 Wind Withdrawn
GEN-2016-001 Not reported 345 300.3 Wind Withdrawn
GEN-2008-090 Not reported n/r 300 Wind Withdrawn
GEN-2010-001 Not reported 345 300 Wind Operational
GEN-2008-047 Not reported 345 263.1 Wind Operational
GEN-2025-SR28 Not reported 345 263.1 Battery Active
GEN-2014-052 Not reported 345 200 Wind Withdrawn
GEN-2015-082 Not reported 345 200 Wind Operational
GEN-2023-SR11 Not reported 345 200 Battery Withdrawn
GEN-2024-SR7 Not reported 345 200 Solar Active
GEN-2011-014 Not reported 345 198 Wind Operational
GEN-2014-026 Not reported 345 150 Wind Withdrawn
GEN-2024-SR9 Not reported 345 150 Battery Active
GEN-2017-047 Not reported 115 102 Wind Operational
GEN-2006-016 Not reported n/r 100 Wind Withdrawn
GEN-2008-062 Not reported n/r 100 Wind Withdrawn
GEN-2008-063 Not reported n/r 100 Wind Withdrawn
GEN-2009-033 Not reported 115 87 Wind Withdrawn
GEN-2022-148 Not reported 345 75 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first