Queue request GEN-2024-SR7 was listed in the SPP interconnection queue at the end of 2025 as a 200 MW solar project in Beaver County, OK, according to Berkeley Lab’s queue data file. The filing names Beaver County Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2027.

Queue IDGEN-2024-SR7
Project nameNot reported
Status (as published)Active
SubstationBeaver County Substation
Point of interconnectionBeaver County Substation 345 kV
CountyBeaver
StateOK
Voltage345 kV
Capacity200 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Beaver County Substation substation: 6 requests in the SPP queue, 4 active totaling 665.7 MW.

Queue IDProjectMWResourceStatus
GEN-2025-SR28Not reported263.1BatteryActive
GEN-2024-SR9Not reported150BatteryActive
GEN-2026-PR1Not reported52.6WindActive
GEN-2023-SR11Not reported200BatteryWithdrawn
GEN-2022-148Not reported75WindWithdrawn

Beaver, OK: 20 requests in the SPP queue, 8 active totaling 1,676.2 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOG&E
ClusterSurplus; 05 SOUTHWEST
Interconnection serviceERIS
Project typeSurplus
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)IA PENDING
Queue date2024-01-26

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first