Atoka, OK interconnection queue
3 active projects totaling 599 MW in the SPP queue, plus 2 with terminal status (shown grayed).
3active projects
599active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2024-316 | Not reported | 345 | 300 | Solar | Active |
| GEN-2024-184 | Not reported | 138 | 199 | Battery | Active |
| GEN-2023-069 | Not reported | 138 | 100 | Hybrid | Active |
| GEN-2019-015 | Not reported | 138 | 72.6 | Solar | Withdrawn |
| GEN-2023-070 | Not reported | 69 | 50 | Hybrid | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.