Substation Scout

Atoka, OK interconnection queue

3 active projects totaling 599 MW in the SPP queue, plus 2 with terminal status (shown grayed).

3active projects
599active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-316 Not reported 345 300 Solar Active
GEN-2024-184 Not reported 138 199 Battery Active
GEN-2023-069 Not reported 138 100 Hybrid Active
GEN-2019-015 Not reported 138 72.6 Solar Withdrawn
GEN-2023-070 Not reported 69 50 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.