Queue request GEN-2023-069 was listed in the SPP interconnection queue at the end of 2025 as a 100 MW hybrid project in Atoka County, OK, according to Berkeley Lab’s queue data file. The filing names Tupelo - Atoka Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2028.

Queue IDGEN-2023-069
Project nameNot reported
Status (as published)Active
SubstationTupelo - Atoka Line
Point of interconnectionTupelo - Atoka 138 kV Line
CountyAtoka
StateOK
Voltage138 kV
Capacity100 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Atoka, OK: 5 requests in the SPP queue, 3 active totaling 599 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWFEC
ClusterDISIS-2023-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2023-10-02
Components (hybrid)Solar 100 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first