Wellsville substation interconnection queue
1 active project totalling 69 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
69active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-699 | Wellsville 345 kV | 345 | 69 | Gas | Active |
| AH2-106 | Wellsville 345 kV | 345 | 69 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.