Wellsville substation interconnection queue

1 active project totalling 69 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
69active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-699 Wellsville 345 kV 345 69 Gas Active
AH2-106 Wellsville 345 kV 345 69 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.