Substation Scout

Roseland-Williams substation interconnection queue

1 active project totalling 40 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
40active MW
2total filed
Queue IDProjectkVMWResourceStatus
Z2-054 Roseland-Williams 230kV 230 44 Not reported Withdrawn
AB2-020 Roseland-Williams 230kV 230 40 Not reported In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.