PJM.AP-PJM.DPL substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 568552 | PJM.AP-PJM.DPL | n/r | 125 | Not reported | Withdrawn |
| S53B 568550 | PJM.AP-PJM.DPL | n/r | 125 | Not reported | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.