NYISJK-PJM-NYISABC substation interconnection queue

1 active project totalling 1,000 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
1,000active MW
2total filed
Queue IDProjectkVMWResourceStatus
AB2-007 4772393 NYISJK-PJM-NYISABC n/r 1,000 Not reported Withdrawn
T72 812613 NYISJK-PJM-NYISABC n/r 1,000 Not reported Confirmed

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.