Mt. Storm-Valley substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
V3-020 Mt. Storm-Valley 115kV 115 500 Not reported Withdrawn
W1-025 Mt. Storm-Valley 500kV 500 500 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.