Substation Scout

Mt. Storm-Doubs substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
V3-021 Mt. Storm-Doubs 500kV 500 500 Not reported Withdrawn
W1-026 Mt. Storm-Doubs 500kV 500 500 Not reported Withdrawn
T47 Mt. Storm-Doubs 500kV 500 0 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.