Laurelton-Mifflinburg substation interconnection queue

4 active projects totalling 48 MW in the PJM queue, plus 2 with terminal status (shown greyed).

4active projects
48active MW
6total filed
Queue IDProjectkVMWResourceStatus
AF1-333 Limestone Solar 69 12 Solar Engineering and Procurement
AF1-337 Limestone Solar 69 12 Solar Engineering and Procurement
AF1-338 Limestone Solar 69 12 Solar Engineering and Procurement
AF1-339 Limestone Solar 69 12 Solar Engineering and Procurement
AI2-463 Laurelton-Mifflinburg 69 kV 69 5.8 Solar Withdrawn
AI2-464 Laurelton-Mifflinburg 69 kV 69 5.8 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.