Laurelton-Mifflinburg substation interconnection queue
4 active projects totalling 48 MW in the PJM queue, plus 2 with terminal status (shown greyed).
4active projects
48active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-333 | Limestone Solar | 69 | 12 | Solar | Engineering and Procurement |
| AF1-337 | Limestone Solar | 69 | 12 | Solar | Engineering and Procurement |
| AF1-338 | Limestone Solar | 69 | 12 | Solar | Engineering and Procurement |
| AF1-339 | Limestone Solar | 69 | 12 | Solar | Engineering and Procurement |
| AI2-463 | Laurelton-Mifflinburg 69 kV | 69 | 5.8 | Solar | Withdrawn |
| AI2-464 | Laurelton-Mifflinburg 69 kV | 69 | 5.8 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.