Hopkins substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 7 with terminal status (shown greyed).
0active projects
0active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-451 | Hopkins 138 kV | 138 | 108 | Solar | Withdrawn |
| AH1-189 | Hopkins 138 kV | 138 | 84 | Solar | Withdrawn |
| AH2-191 | Hopkins 138 kV | 138 | 63 | Hybrid | Withdrawn |
| AH2-207 | Hopkins 138 kV | 138 | 57 | Hybrid | Withdrawn |
| AI2-331 | Hopkins 138 kV | 138 | 42.8 | Solar | Withdrawn |
| AI1-116 | Hopkins 138 kV | 138 | 42 | Solar | Withdrawn |
| AI1-117 | Hopkins 138 kV | 138 | 36 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.