Hopkins substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 7 with terminal status (shown grayed).
7 PJM queue filings name Hopkins as the point of interconnection, all in WV.
Target commercial operation dates as filed run from Mar 2024 to Jun 2025 (7 filings).
Transmission owner as filed: AEP (1 filing).
0active projects
0active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-451 | Hopkins 138 kV | 138 | 108 | Solar | Withdrawn | May 2025 |
| AH1-189 | Hopkins 138 kV | 138 | 84 | Solar | Withdrawn | Jun 2025 |
| AH2-191 | Hopkins 138 kV | 138 | 63 | Hybrid | Withdrawn | Mar 2024 |
| AH2-207 | Hopkins 138 kV | 138 | 57 | Hybrid | Withdrawn | Mar 2024 |
| AI2-331 | Hopkins 138 kV | 138 | 42.8 | Solar | Withdrawn | May 2025 |
| AI1-116 | Hopkins 138 kV | 138 | 42 | Solar | Withdrawn | Sep 2024 |
| AI1-117 | Hopkins 138 kV | 138 | 36 | Solar | Withdrawn | Sep 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.