Substation Scout

Graceton-Safe Harbor substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

Target commercial operation date as filed: Jun 2016 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AB1-062 Graceton-Safe Harbor n/r 0 Not reported Withdrawn Jun 2016
AB1-102 Graceton-Safe Harbor 230kV 230 0 Not reported Withdrawn Jun 2016

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first