Substation Scout

Graceton-Safe Harbor substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AB1-062 Graceton-Safe Harbor n/r 0 Not reported Withdrawn
AB1-102 Graceton-Safe Harbor 230kV 230 0 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.