Conesville substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG1-161 Conesville 138 kV 138 58.9 Solar Withdrawn
AI1-168 Conesville 345 kV 345 35.2 Wind Withdrawn
AG2-383 Conesville 138 kV 138 29.9 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.