Cloverdale-Jacksons Ferry substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

Target commercial operation date as filed: Jun 2016 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AB1-060 Cloverdale-Jacksons Ferry 765kV 765 0 Not reported Withdrawn Jun 2016
AB1-101 Cloverdale-Jacksons Ferry 765kV 765 0 Not reported Withdrawn Jun 2016

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.