Substation Scout

Chippewa D557 8. substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-037 Chippewa D557 8.320 kV 320 0 Solar Withdrawn
AH1-275 Chippewa D557 8.32 kV 32 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.