Beaver Creek substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Beaver Creek as the point of interconnection, all in KY.

Target commercial operation date as filed: Sep 2024 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH1-618 Beaver Creek 138 kV 138 120 Solar Withdrawn Sep 2024
AH1-619 Beaver Creek 138 kV 138 120 Solar Withdrawn Sep 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.