Alburtis-Hosensack substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
V3-023 Alburtis-Hosensack 500kV 500 500 Not reported Withdrawn
W1-028 Alburtis-Hosensack n/r 500 Not reported Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.