Wayne, IN interconnection queue

2 active projects totalling 384 MW in the PJM queue, plus 3 with terminal status (shown greyed).

2active projects
384active MW
5total filed
Queue IDProjectkVMWResourceStatus
C01-1404 Desoto - Tanners Creek 345 kV 345 200 Battery Active
C01-1202 Desoto - Tanners Creek 345 kV 345 184 Solar Active
AI1-085 Tanners Creek - DeSoto 345 kV 345 174 Solar Withdrawn
AG2-170 Whitewater Valley Power Station 69 kV 69 58.7 Solar Withdrawn
AI1-140 Selma Parker - Richmond 138 kV 138 40 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.