Substation Scout

Washington, KY interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI1-132 Fredricksburg 69 kV 69 83 Hybrid Withdrawn
AF1-116 Marion County 161 kV 161 72 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.