Substation Scout

Warren, NC interconnection queue

1 active project totaling 44.5 MW in the PJM queue, plus 2 with terminal status (shown grayed).

1active projects
44.5active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG2-522 Five Forks DP - Littleton DP 115 kV 115 48 Solar Withdrawn
AC1-054 Hawtree Creek 115 44.5 Solar In Service
AA2-169 Five Forks Solar 115 13.7 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.