Substation Scout

Unknown, WV interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 9 with terminal status (shown grayed).

0active projects
0active MW
9total filed
Queue IDProjectkVMWResourceStatus
V3-020 Mt. Storm-Valley 115kV 115 500 Not reported Withdrawn
V3-021 Mt. Storm-Doubs 500kV 500 500 Not reported Withdrawn
W1-025 Mt. Storm-Valley 500kV 500 500 Not reported Withdrawn
W1-026 Mt. Storm-Doubs 500kV 500 500 Not reported Withdrawn
W1-027 502 Junction-Meadowbrook 500kV 500 500 Not reported Withdrawn
H08_W66 Windsor 138 kV 138 300 Gas Withdrawn
V1-009 Gilbert 46kV 46 11 Hydro Withdrawn
P45B Mt. Storm 500kV 500 0 Not reported Withdrawn
U4-018 Bedington-Harmony Jct 138kV 138 0 Not reported Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first