| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| V3-020 | Mt. Storm-Valley 115kV | 115 | 500 | Not reported | Withdrawn |
| V3-021 | Mt. Storm-Doubs 500kV | 500 | 500 | Not reported | Withdrawn |
| W1-025 | Mt. Storm-Valley 500kV | 500 | 500 | Not reported | Withdrawn |
| W1-026 | Mt. Storm-Doubs 500kV | 500 | 500 | Not reported | Withdrawn |
| W1-027 | 502 Junction-Meadowbrook 500kV | 500 | 500 | Not reported | Withdrawn |
| H08_W66 | Windsor 138 kV | 138 | 300 | Gas | Withdrawn |
| AB1-109 | Mountaineer #1 | n/r | 36 | Coal | Partially in Service - Under Construction |
| V1-009 | Gilbert 46kV | 46 | 11 | Hydro | Withdrawn |
| AB1-180 | Seven Islands Environmental Solutions, LLC | 12 | 2.4 | Gas | In Service |
| P45B | Mt. Storm 500kV | 500 | 0 | Not reported | Withdrawn |
| U4-018 | Bedington-Harmony Jct 138kV | 138 | 0 | Not reported | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.