2 active projects totalling 38.4 MW in the PJM queue, plus 9 with terminal status (shown greyed).

2active projects
38.4active MW
11total filed
Queue IDProjectkVMWResourceStatus
V3-020 Mt. Storm-Valley 115kV 115 500 Not reported Withdrawn
V3-021 Mt. Storm-Doubs 500kV 500 500 Not reported Withdrawn
W1-025 Mt. Storm-Valley 500kV 500 500 Not reported Withdrawn
W1-026 Mt. Storm-Doubs 500kV 500 500 Not reported Withdrawn
W1-027 502 Junction-Meadowbrook 500kV 500 500 Not reported Withdrawn
H08_W66 Windsor 138 kV 138 300 Gas Withdrawn
AB1-109 Mountaineer #1 n/r 36 Coal Partially in Service - Under Construction
V1-009 Gilbert 46kV 46 11 Hydro Withdrawn
AB1-180 Seven Islands Environmental Solutions, LLC 12 2.4 Gas In Service
P45B Mt. Storm 500kV 500 0 Not reported Withdrawn
U4-018 Bedington-Harmony Jct 138kV 138 0 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.