Unknown, PA interconnection queue
1 active project totalling 5 MW in the PJM queue, plus 10 with terminal status (shown greyed).
1active projects
5active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| E17_W26 | Taylorstown 500 kV | 500 | 1,595 | Gas | Withdrawn |
| F05_W38 | White Oak 500 kV | 500 | 1,200 | Gas | Withdrawn |
| H14_W67 | Enon 138 kV | 138 | 500 | Gas | Withdrawn |
| V3-023 | Alburtis-Hosensack 500kV | 500 | 500 | Not reported | Withdrawn |
| W1-028 | Alburtis-Hosensack | n/r | 500 | Not reported | Withdrawn |
| W1-015 | Shade Gap 115kV | 115 | 7.9 | Wind | Withdrawn |
| D06 | Scrubgrass NUG | 115 | 5 | Gas | In Service |
| U2-089 | Kemptown 500kV | 500 | 0 | Not reported | Withdrawn |
| U4-031 | Elrama-Mitchell 138kV | 138 | 0 | Not reported | Withdrawn |
| V1-005 | Elrama-Mitchell 138kV | 138 | 0 | Not reported | Withdrawn |
| V1-006 | Elrama-Mitchell 138kV | 138 | 0 | Not reported | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.