Substation Scout

Unknown, PA interconnection queue

1 active project totalling 5 MW in the PJM queue, plus 10 with terminal status (shown greyed).

1active projects
5active MW
11total filed
Queue IDProjectkVMWResourceStatus
E17_W26 Taylorstown 500 kV 500 1,595 Gas Withdrawn
F05_W38 White Oak 500 kV 500 1,200 Gas Withdrawn
H14_W67 Enon 138 kV 138 500 Gas Withdrawn
V3-023 Alburtis-Hosensack 500kV 500 500 Not reported Withdrawn
W1-028 Alburtis-Hosensack n/r 500 Not reported Withdrawn
W1-015 Shade Gap 115kV 115 7.9 Wind Withdrawn
D06 Scrubgrass NUG 115 5 Gas In Service
U2-089 Kemptown 500kV 500 0 Not reported Withdrawn
U4-031 Elrama-Mitchell 138kV 138 0 Not reported Withdrawn
V1-005 Elrama-Mitchell 138kV 138 0 Not reported Withdrawn
V1-006 Elrama-Mitchell 138kV 138 0 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.