Substation Scout

Unknown, OH interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 6 with terminal status (shown greyed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
X3-051 Flatlick 765kV 765 610 Gas Withdrawn
Z2-018 South Canton-Harmon 345kV 345 82 Not reported Withdrawn
Y1-023 Felicity 69kV 69 7.6 Solar Withdrawn
Z1-035 Lake Road 11.5 kV 11.5 2.3 Offshore Wind Withdrawn
Y1-024 Felicity 12.5kV 12.5 1.1 Solar Withdrawn
X2-051 Not reported n/r 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.