Unknown, MD interconnection queue
1 active project totalling 100 MW in the PJM queue, plus 6 with terminal status (shown greyed).
1active projects
100active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G30_W55 | Kempton 500 kV | 500 | 500 | Gas | Withdrawn |
| W3-122 | Brandon Shores-Riverside 230kV | 230 | 236 | Not reported | Withdrawn |
| Y3-030 | Sandy Springs-High Ridge 230kV | 230 | 127 | Not reported | Withdrawn |
| AB2-021 | Keeney-Rock Springs 500kV | 500 | 100 | Not reported | In Service |
| AH2-055 | TBD 69kV | 69 | 0 | Solar | Withdrawn |
| O14 | Black Oak - Bedinton RTU | n/r | 0 | Not reported | Withdrawn |
| W3-123 | Brandon Shores | n/r | 0 | Not reported | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.