Unknown, IN interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 1 with terminal status (shown greyed).

0active projects
0active MW
1total filed
Queue IDProjectkVMWResourceStatus
V2-019A Dumont 765kV 765 7,900 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.