0 active projects
totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
G00_MTX2B
Keeney-Steele 230kV
230
0
Not reported
Withdrawn
J01_MTX
Hope Creek 500kV Cedar Creek 230kV
500
0
Not reported
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.