Summit, OH interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1947 | Gilchrist 138 kV | 138 | 285 | Battery | Withdrawn |
| X1-064A_AT13 | Barberton-Star 138kV | 138 | 268 | Gas | Withdrawn |
| X2-085 | Barberton Solar | 23 | 5.3 | Solar | Withdrawn |
| Y1-074 | Martin 12kV | 12 | 3 | Solar | Withdrawn |
| Z2-020 | New Franklin 12.47kV | 12.5 | 0 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.