Summit, OH interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
C01-1947 Gilchrist 138 kV 138 285 Battery Withdrawn
X1-064A_AT13 Barberton-Star 138kV 138 268 Gas Withdrawn
X2-085 Barberton Solar 23 5.3 Solar Withdrawn
Y1-074 Martin 12kV 12 3 Solar Withdrawn
Z2-020 New Franklin 12.47kV 12.5 0 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.