Sullivan, TN interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
O58 Tenn Eastman 138kV 138 75 Coal Withdrawn
AA1-032 Kingsport Mill n/r 45 Other Deactivated
P42 West Kingsport 138 45 Other Deactivated

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.