Scott, KY interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE1-251 Penn-Lees Lick 69 kV 69 72 Hybrid Withdrawn
AG2-596 Renaker-Avon 138 kV 138 39 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.