Sandusky, OH interconnection queue

1 active project totalling 26.3 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
26.3active MW
4total filed
Queue IDProjectkVMWResourceStatus
AD1-052 Freemont Energy Center n/r 26.3 Gas In Service
V4-039A_AT3 MOABs A16, A17, A18 n/r 22 Gas Withdrawn
X4-030 Freemont 69kV 69 5.2 Solar Withdrawn
Z1-093 Woodville Battery 34.5kV 34.5 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.