Sandusky, OH interconnection queue
1 active project totalling 26.3 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
26.3active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AD1-052 | Freemont Energy Center | n/r | 26.3 | Gas | In Service |
| V4-039A_AT3 | MOABs A16, A17, A18 | n/r | 22 | Gas | Withdrawn |
| X4-030 | Freemont 69kV | 69 | 5.2 | Solar | Withdrawn |
| Z1-093 | Woodville Battery 34.5kV | 34.5 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.