Rockbridge, VA interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-556 | Lexington 115 kV | 115 | 100 | Battery | Withdrawn |
| AG2-080 | Sand Dragon Energy | 115 | 78 | Battery | Withdrawn |
| AG2-528 | Bustleburg Tap - Fairfield DP 115 kV | 115 | 72.8 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.