0 active projects
totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
0active projects
0active MW
3total filed
Queue ID
Project
kV
MW
Resource
Status
AG1-556
Lexington 115 kV
115
100
Battery
Withdrawn
AG2-080
Sand Dragon Energy
115
78
Battery
Withdrawn
AG2-528
Bustleburg Tap - Fairfield DP 115 kV
115
72.8
Hybrid
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.