Rockbridge, VA interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG1-556 Lexington 115 kV 115 100 Battery Withdrawn
AG2-080 Sand Dragon Energy 115 78 Battery Withdrawn
AG2-528 Bustleburg Tap - Fairfield DP 115 kV 115 72.8 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.