Randolph, IL interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Y2-095 | Sullivan 765 kV | 765 | 1,211 | Coal | Withdrawn |
| Y2-116 | Sullivan 765 kV | 765 | 600 | Coal | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.