Pocahontas, IA interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| T92 | Paddtown I Wind 1500 MW | n/r | 300 | Wind | Withdrawn |
| T93 | Paddtown II Wind 1500 MW | n/r | 300 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.