0 active projects
totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
AD2-123
East Danville-Roxborough 230 kV
230
68.2
Solar
Withdrawn
AD2-124
East Danville-Roxborough 230 kV
230
14.5
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.