Substation Scout

Person, NC interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AD2-123 East Danville-Roxborough 230 kV 230 68.2 Solar Withdrawn
AD2-124 East Danville-Roxborough 230 kV 230 14.5 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.