0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AD2-123 East Danville-Roxborough 230 kV 230 68.2 Solar Withdrawn
AD2-124 East Danville-Roxborough 230 kV 230 14.5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.