Perry, PA interconnection queue
1 active project totalling 715 MW in the PJM queue, plus 9 with terminal status (shown greyed).
1active projects
715active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1197 | Juniata - Bernheisel 500 kV | 500 | 715 | Gas | Active |
| C01-1841 | [New Buffalo 500kV Substation cutting into Juniata-Alburtis 500kV] 500 kV | 500 | 570 | Battery | Withdrawn |
| AH1-533 | Greenwood Solar II | n/r | 38.5 | Hybrid | Withdrawn |
| AE2-215 | Blain 115 kV | 115 | 36 | Solar | Withdrawn |
| AG2-606 | Sunbury-Juniata 500 kV | 500 | 35.6 | Hybrid | Withdrawn |
| AG2-418 | Blain 115 kV | 115 | 20 | Hybrid | Withdrawn |
| AF1-295 | Blain 115 kV II | 115 | 12 | Battery | Withdrawn |
| AF2-286 | PE-Windy Hill | 12.5 | 0 | Hybrid | Withdrawn |
| AF2-287 | PE-Green Park | 12.5 | 0 | Hybrid | Withdrawn |
| AF2-288 | PE-Dellville | 12.5 | 0 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.