Pendleton, WV interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
C01-1726 North Franklin 138 kV 138 115 Wind Withdrawn
K26 Liberty Gap WF 138 31 Wind Withdrawn
AH2-386 North Franklin 138 kV 138 28.2 Wind Withdrawn
AC2-155 North Franklin 138kV 138 13 Wind Withdrawn
J07 Liberty Gap WF 138 0 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.