0 active projects
totaling 0 MW in the PJM queue, plus 5 with terminal status (shown grayed).
0active projects
0active MW
5total filed
Queue ID
Project
kV
MW
Resource
Status
C01-1726
North Franklin 138 kV
138
115
Wind
Withdrawn
K26
Liberty Gap WF
138
31
Wind
Withdrawn
AH2-386
North Franklin 138 kV
138
28.2
Wind
Withdrawn
AC2-155
North Franklin 138kV
138
13
Wind
Withdrawn
J07
Liberty Gap WF
138
0
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.