0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1726 | North Franklin 138 kV | 138 | 115 | Wind | Withdrawn |
| K26 | Liberty Gap WF | 138 | 31 | Wind | Withdrawn |
| AH2-386 | North Franklin 138 kV | 138 | 28.2 | Wind | Withdrawn |
| AC2-155 | North Franklin 138kV | 138 | 13 | Wind | Withdrawn |
| J07 | Liberty Gap WF | 138 | 0 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.