New Kent, VA interconnection queue
3 active projects totalling 253.8 MW in the PJM queue, plus 5 with terminal status (shown greyed).
3active projects
253.8active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-309 | Lanexa 230 kV | 230 | 150 | Battery | Withdrawn |
| C01-1872 | Lanexa - King Queen 230 kV | 230 | 150 | Battery | Active |
| C01-1873 | Ladysmith CT - St Johns 230 kV | 230 | 90 | Battery | Active |
| AG2-361 | Lanexa – Dunnsville 230 kV | 230 | 63.5 | Solar | Withdrawn |
| AG2-461 | Lanexa - Dunnsville 230 kV | 230 | 57.3 | Solar | Withdrawn |
| AG2-362 | Lanexa - Dunnsville 230 kV | 230 | 36.5 | Battery | Withdrawn |
| AH1-231 | Lanexa 230kV | 230 | 28.8 | Battery | Withdrawn |
| AB2-024 | Correctional 34.5kV | 34.5 | 13.8 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.